Amur Gas Processing Plant
news-img1

ZapSibNeftekhim is SIBUR's petrochemical facility, which is the largest state-of-art petrochemical complex in Russia and one of the largest in the world.

Amur Gas Processing Plant (AGPP) is operational in the Far Eastern Federal District of Russia, in the Svobodnensky District of the Amur region. It is the largest gas processing plant in Russia and one of the largest in the world. The design capacity of the plant is up to 42 billion cubic meters of gas a year. The plant got commissioned in the year 2021.

  • Client : ZapSibNeftekhim
  • Project & Country : Amursky Gas Processing Plant Project (AGPP), Russia
  • EPC : Linde, Germany
  • Consultant : Linde, Germany

The EPC “Linde, Germany” is a leading global industrial gases and engineering company with 2021 sales of $31 billion (€26 billion).

Advance valves supplied its Dual plate check valves and Triple Offset Butterfly Valves with the below mentioned specifications for the project via Linde, Germany.

Valves Supplied Size Rating MOC Application Standards Range Available
Dual Plate Check Valves 2” to 40” 150# - 600# SS/LCB Cryo / Non-Cryo API 594, 598 & 6D, BS 6364, API 6FA 2” to 80” ANSI #2500
Triple Offset Butterfly Valves with Manual and Electric Actuator 3” to 42” 150# - 600# SS/LCB Cryo / Non-Cryo API 609 & API 598 Up to 48” #150

These valves are durable and are especially tough due to their corrosion resistance ability. With high corrosion resistance, these valves can endure extremely high and low pressure.

Advance Valves Group has been a company providing world-class technology solutions to global customers for the past three & half decades through a well-oiled network of offices and dealers in India, Middle East, US & Europe.

The company has been a Pioneer & Innovator for its wide range of Valves like Dual Plate Check Valves, Balancing Valves, Triple Eccentric Butterfly Valves & Valves with Pre-Insulation manufactured at its four fully equipped ultra-modern facilities in India.